Maximizing Efficiency with Certified Union Crews
Union installation and dismantle (I&D) costs at major exhibitions can quickly escalate if structural crates arrive un-sequenced or require extensive on-site fabrication.
Proven Cost-Saving Tactics:
- Local Pre-Assembly: Pre-fit aluminum frames and cable runs in our staging facility before truck dispatch
- Straight-Time Scheduling: Schedule move-in shifts between 8:00 AM and 4:30 PM Monday through Friday to avoid 1.5x and 2.0x overtime rates
- Color-Coded Crate Packing: Organize crates in order of assembly (flooring first, truss second, graphic skins last)